ASCTEC Online Limited have been associated with many
well known companies over the years, however more notable clients
include: V2 Music, Broadcasting Data Services, Cherwell Council,
Sun Chemical, Natexis Banque Populaires, Essex Ambulance Service,
Heidelberg Graphic Equipment and Hotchkiss
Ltd.
ASCTEC Online Limited encourages prospective clients to contact companies
they have worked with, however we do ask that the initial contact
be made through ourselves.
 |
Broadcasting
Data Services are a media based company who
specialise in delivering television listings and monitoring
the electronic programming guides for satellite broadcasters
and to the public.
They have recently moved from their
Wood Lane premises to a new Building in Ealing Broadway,
London and ASCTEC Online Limited was contracted to design and implement a
new structured cabling system infrastructure for the new building. Some 800
plus ITT LAN 200 outlets were installed across 3 floors
to provide current and future
10/100 connectivity, without compromising the proposed day-to-day operation
of BDS.
ASCTEC Online Limited specified and provided the new
communication cabinets and specialist computer racking
for the ground floor communications room, into
which the new
cabling infrastructure and associated 3Com network equipment was installed.
The specification enabled BDS to incorporate a Gigabit Ethernet backbone
infrastructure
with 10/100 connectivity to all of their users.
Built-in
redundancy within the network equipment was devised to
ensure that within 30 minutes of a complete failure
of
the Gigabit Ethernet switch
and
its back
up power unit, all users could continue to access the main servers with
only a minor deterioration in speed.
We
continue to be involved with Broadcasting Data Services.
back to top
|
 |
A world-wide company primarily involved with the making and
distribution of printing inks. ASCTEC Online Limited has been and
still is involved with the installation of high performance
cabling installations through out the UK for Sun
Chemical.
The majority of their networks are installed within an industrial
environment with caution given to the chemical elements required
to produce the ink products.
ASCTEC Online Limited is entrusted to install new cabling into Sun's sites after demonstrating
our capabilities to understand the clients Health & Safety related issues.
This was a deciding factor when Sun Chemical initially chose a cabling installer.
Recently, we have been involved with Sun Chemicals migration of separate I.T.
functions into one Data Centre based in Watford. The data centre manages each
of Sun's European sites with links back to the American corporate offices. The
nature of the data centre requires meticulous planning of any proposed work with
cohesive project management, there is no room for unplanned down time whatsoever.
Cisco
Network Equipment is the preferred equipment for Sun Chemical
worldwide and consequently it is Cisco equipment that we
supply and install for them.
back
to top
|
 |
V2
Music is Richard Branson's record label and has its
UK base in the very exclusive Holland Park area. The office
was
at some time a large town house and therefore not designed
as a modern day office environment. Perhaps not unsurprisingly,
this makes even the smallest cabling installation less than
straightforward. The basement communications room is cramped
due to the extremely small size of the room; however it was
the only area in the basement, which could give reasonable
access to the rest of the building without installing large
trunking routes. The client did not wish to have any visible
large trunking routes in the building.
Although
there is an I.T. function within V2, their emphasis is
based more on providing support and solutions for MP3 based
applications, this means that the
infrastructure is left to ASCTEC Online Limited to specify, install and to some
degree maintain. The music industry is a dynamic and often
changing environment, which
often means that we are required at short notice, to provide additional cabling
in new premises. As with all our clients, our continued involvement is a
testimony to our standards of workmanship and customer
care.
back
to top
|
 |
Heidelberg
Graphic Equipment is one of, if not the, largest
supplier of Printing and Pre-Press equipment in the world.
ASCTEC Online Limited has been involved with the Pre-Press division
for many years, providing cabling infrastructures for their
clients through out the UK.
Although a typical installation does not usually consist of many outlets, all
Heidelberg installations comprise of equipment able to achieve a true constant
network operation speed of 100mbts, therefore, the infrastructure installed has
to support this. More and more Heidelberg clients are migrating to Gigabit Ethernet
technology and require ASCTEC Online Limited to provide the infrastructure to support
this technology.
Printers
rely on continuous working to enable them to produce cost
efficient but good quality printed material. Therefore,
all networks installed into any
Heidelberg clients premises have a high fail-safe tolerance designed into
the initial specification, to ensure that apart from the
unlikely event of a complete
server failure, the client can still continue working with their operation.
back
to top
|

|
Recently
Hotchkiss decided
to upgrade their network in their Eastbourne office from
10baseT Thin Ethernet to Cat 5+, the
catalyst for this was the implementation of a new telephone
system that would require new cabling in order to access
all the benefits of the new telephone system.
Their
existing infrastructure was typical of many companies and
had evolved by need rather than design and therefore
was lots of ‘segments’ rather
then a complete network. Asctec were invited to design a new network that
would integrate the new telephone and data systems.
The
Hotchkiss office had very little in the way of routes
and containment to aid the installation and therefore
the first priority was to understand
the building
and with the kind assistance of Hotchkiss develop and install the routes.
A large quantity of basket work was used to contain the cable throughout
the building.
A
comms room was then developed (previously Hotchkiss had
no dedicated comms area) to provide secure accommodation
for all the equipment required
for
the telephone and data system.
300 + sockets were installed through out the building with voice links
to the new telephone system. The project was completed over a 4 week
period with co-operation
from the client.